From Name:
From Email:
To Name:
To Email:

Optional Message:


Smart grid goes to jail

from Smart Grid News

An $11.7 million microgrid project designed and built by Chevron Energy Solutions will mean Santa Rita Jail in California's Alameda County can sustain power for daily operations and security if its connection to the grid is interrupted. The jail's onsite power generation integrates with energy storage to ensure power is never lost. The microgrid also allows the jail to buy power from the utility during least expensive nonpeak hours and store it for use during the most expensive summer peak hours. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063