From Name:
From Email:
To Name:
To Email:

Optional Message:


Demolition work continues on bridge in Florida

from Construction Equipment Guide

At a hectic series of central Florida interchanges, SR 417 and SR 408 there was little time available for demolishing the old bridges and then reconstructing new ones in their place. As a result, the new bridges needed were constructed and then when traffic was up and running the demolition of the older structures took place. In the four bridges being demolished there was 2.1 million pounds of steel to be dismantled and processed through recycling. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063