From Name:
From Email:
To Name:
To Email:

Optional Message:


Gammon Steel tracks modular components for buildings

from RFID Journal

Large buildings are often constructed using prefabricated pieces that arrive onsite shortly before being incorporated into a new structure. Such modularization of construction projects shortens project times and lowers labor costs. However, mistakes made during this scenario — such as the installation or delivery of an incorrect modular piece, or an item's failure to arrive onsite when needed — can be costly. In the construction industry, most assets and their usage are monitored simply via paper invoices and manifests — a manual process that can enable errors and take time to complete. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063