From Name:
From Email:
To Name:
To Email:

Optional Message:


Niagara Tunnel completion important piece for Ontario's hydroelectric power supply

from Hydro World

The Ontario government is celebrating following the completion of the Niagara Tunnel Project, which will direct water to the province's 2,000-MW Sir Adam Beck hydropower plant. The 10-kilometer-long tunnel measures four stories tall and is lined with 60 cm of cast-in-place concrete, allowing water to flow through the Niagara Tunnel at a rate of more than 500 cubic feet per second. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063