From Name:
From Email:
To Name:
To Email:

Optional Message:


CALL FOR DATA — Single-Step vs. Two-Step Design-Build

from DBIA

The DBIA/ASU team currently needs procurement data from single-step and two-step projects in order to statistically validate the preliminary results of the study and render them defensible to serve DBIA members and industry. Therefore, ASU has developed a survey that is available both online and through this PDF project information related to the timing and cost of procurement for your design-build projects. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063