From Name:
From Email:
To Name:
To Email:

Optional Message:


138-kV power line proposed

from Sherwood Park News

An information meeting for South Cooking Lake residents about a proposed AltaLink line will be held shortly. AltaLink, an independent transmission company, has proposed to build a double-circuit 138-kV transmission line, which would result in the upgrading and expansion of the Cooking Lake substation. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063