From Name:
From Email:
To Name:
To Email:

Optional Message:


B.C. Hydro, Alberta grid operator to boost transmission link capacity

from Platts

The Alberta Electric System Operator and B.C. Hydro are to work together to restore transfer capacity on the British Columbia-Alberta inter-tie, which operates at levels well below its rated capacity. Alberta can import about 700 MW to 800 MW from British Columbia and Montana, according to Angela Anderson, a spokeswoman for the AESO. The grid operator expects to increase its overall import capability to 1,500 MW, with most of the work being finished in the 2018 to 2020 timeframe, she said. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063