From Name:
From Email:
To Name:
To Email:

Optional Message:


County resisting AltaLink line

from Sherwood Park News

Strathcona County will be registering as an intervener with the Alberta Utilities Commission in hopes that a proposed AltaLink power line will not run through the county. A portion of the 25-kilometre-long AltaLink Cooking Lake 138-kV transmission line and substation upgrade project is proposed to run parallel to Highway 14, but has many rural residents opposed to the project, as the line would be nearby their homes. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063