From Name:
From Email:
To Name:
To Email:

Optional Message:


National Energy Board: More testing needed for Ontario's Line 9 pipeline

from Metro News

The National Energy Board is demanding Enbridge conduct more tests along its Line 9 pipeline before the oil can begin to flow, a reversal from just 15 months ago. In a decision recently, the federal watchdog said Enbridge must conduct hydrostatic testing along three sections of pipe between Hamilton, ON, and Montreal "to provide the necessary level of confidence in the pipeline's safe operation." more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063