From Name:
From Email:
To Name:
To Email:

Optional Message:


ATCO looks to plug Progress Energy into grid, cut emissions

from Alaska Highway News

Plugging Progress Energy's drilling sites in Pink Mountain into the W.A.C. Bennett Dam would cut down on "decades of greenhouse gas emissions," B.C.'s deputy energy minister says in a letter outlining plans for a new 140-kilometre transmission line in the North Peace. Calgary-based ATCO Power is proposing to build the transmission line from the GM Shrum generating station at the Bennett dam to Progress Energy sites north of Fort St. John. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063