From Name:
From Email:
To Name:
To Email:

Optional Message:


Ontario's opposition parties demand reports into Nipigon River Bridge failure

from MM&D

Ontario's opposition parties are demanding the release of expert reports into the $106 million Nipigon River Bridge, which failed last January less than two months after it opened. The steel decking on the bridge lifted about 60 centimetres, causing a 24-hour closure of the east-west link on the Trans Canada highway and forcing about 1,300 trucks a day to detour for several weeks. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063