From Name:
From Email:
To Name:
To Email:

Optional Message:


Deepwater Wind launches multimillion dollar offshore geotechnical engineering program

from Windpower Engineering & Development

Working from a 200-foot class lift boat mobilized from Quonset Point, Rhode Island, a 28-person GZA-led crew is now taking and evaluating soil samples from the sea floor in 100 to 120 feet of water about 15 miles southeast of Block Island. The offshore sampling is one of the early phases of what will be a five-month-long review by Deepwater Wind off its offshore leased property. Once permits are in hand, local construction work on the 90-MW South Fork Wind Farm will begin in 2021, with the wind farm in operation in 2022. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063