From Name:
From Email:
To Name:
To Email:
Optional Message:
Exploring the value of BIM
from Concrete Construction
Even with building information modeling becoming more prevalent, it's not often that the same 3D model is used throughout a project — from estimating to the field. For decades, 2D was the industry standard and even with more projects moving to 3D, we still see a fair amount of re-work in shifting between 2D drawings and 3D models. When this happens, we lose the ability to visualize and the resulting re-work is time-consuming and opens up the potential for errors which, in essence, defeats the purpose of BIM.
more
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063