From Name:
From Email:
To Name:
To Email:

Optional Message:


AltaLink seeking power line input

from Red Deer Advocate

AltaLink has whittled down four potential power line routes in central Alberta to two. The Alberta Electric System Operator has determined the existing transmission system in the area is reaching its limits and a new 240-kilovolt power line is needed to meet future electricity demands and to allow additional generation to come on line. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063