From Name:
From Email:
To Name:
To Email:

Optional Message:


Bids submitted for the replacement of Halfway River bridge

from Energetic City

Bids have been submitted for the replacement of the Halfway River bridge. As part of B.C. Hydro’s project to realign Highway 29 for the Site C reservoir, four bridges will need to be replaced, with the Halfway River bridge as a top priority. The cost to build a new 1,042-metre bridge is estimated to be between $104 million to $134 million. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063