From Name:
From Email:
To Name:
To Email:

Optional Message:


Cleaning up at the Timmins landfill site

from Timmins Times

The City of Timmins will spend more than $89,000 for an engineering report on collecting methane gas at the Deloro landfill site along with the creation of a leachate pond for dealing with ground contaminants. The money is just for the consulting engineering and design work. The actual cost of building a methane and leachate facility will revealed at some point in the future. more


Powered by MultiBriefs
7701 Las Colinas Blvd., Ste. 800, Irving, TX 75063